Just reading the laterite instructions its all straight forward but their is one bit that confuses me.
After putting the laterite iin and distrubutign it evenly over the base it says to add 1" off gravel on top then mix the gravel evenly through the laterite...
I dont get how it means to mix the laterite with the gravel when obviously the laterite is on the bottom this is surely impossible unless I try bring some of the laterite to the surface and mix it around?
After putting the laterite iin and distrubutign it evenly over the base it says to add 1" off gravel on top then mix the gravel evenly through the laterite...
I dont get how it means to mix the laterite with the gravel when obviously the laterite is on the bottom this is surely impossible unless I try bring some of the laterite to the surface and mix it around?